1951
District 2
Select column header to sort. Hyperlinked items will open a new window.
Operation NameNumberTypeOpeningDistrictCityCountyCompany NameRailroad Shipments (tons)Railroad to MineTruck Shipments (tons)Total Production (tons)Days WorkedEmployeesNotes
A&M Mine2Jessup 2LackawannaA. & M. Coal Co.3,9011,9225,82324810Coal prepared at Moosic Mountain Breaker.
A&R Mine2Jessup 2LackawannaA. & R. Coal Co.2,7681,3634,1312196Coal prepared at Moosic Mountain Breaker.
Ace Breaker2Blakely 2LackawannaAce Coal Co.2,1645,1468,32522833 
Blue Flame Mine2Jessup 2LackawannaBlue Flame Coal Co.11,8062,08313,88925420Coal prepared at Pompey Breaker.
Butler & Kalata Stripping2 LackawannaButler & Kalata1,4453171,762257Discontinued operation in January. Coal prepared at Bolands Breaker.
C&L Mine2Blakely 2LackawannaC. & L. Coal Co.2,2585,2717,52924612Coal prepared at Ace Breaker.
Carson Stripping2Scranton 2LackawannaCarson Coal Co.4,8715415,412897Discontinued operation in April. Coal prepared at Marvine Breaker.
Consagra Breaker2Jessup 2LackawannaConsagra Coal Co.0001221Discontinued operation in March.
DeAngelis Mine2Archbald 1LackawannaDeAngelis Coal Co.4,95604,95619616Discontinued operation in October. Coal prepared at Bolands Breaker.
Eddy Creek Mine2Olyphant 1LackawannaHudson Coal Co.512,6770659,7462401018 
F&G Mine2Blakely 2LackawannaF. & G. Coal Co.6801,5882,2681698Coal prepared at Ace Breaker.
Fabri Mine2 LackawannaFabri Coal Co.3,2221,5874,8091887Coal prepared at Moosic Mountain Breaker.
G&S Mine2Jessup 2LackawannaG. & S. Coal Co.1,8589152,7731319Discontinued operation in July. Coal prepared at Moosic Mountain Breaker.
Gasparini Stripping2Jessup 2LackawannaGasparini Excavating Co.26,00214,28240,28428428Coal prepared at Pompey, Waddell, Ace and Meadowside breakers.
Moosic Mountain Breaker2Olyphant 1LackawannaMoosic Mountain Coal Co.00017823 
Moosic Mountain Bank2Olyphant 1LackawannaMoosic Mountain Coal Co.10,330010,3301044Coal prepared at Moosic Mountain Breaker.
Moosic Mountain Stripping2Olyphant 1LackawannaMoosic Mountain Coal Co.3,1971,5754,7721244Coal prepared at Moosic Mountain Breaker.
Mt. Alden Breaker2Throop 2LackawannaMt. Alden Coal Co.000609Discontinued operation in May.
Ondrick Mine2Jessup 2LackawannaOndrick Coal Co.1,02101,0211176Coal prepared at Waddell Breaker.
Perry Stripping2 LackawannaPerry Construction Co.77,6244,88182,50529823Coal prepared at Powderly Breaker.
Rosetti Mine2Jessup 2LackawannaRosetti Coal Co.2,0541,1563,2102736Coal prepared at Underwood Breaker.
Smith Mine2Jessup 2LackawannaSmith Coal Co.4611,0771,5381826Coal prepared at Ace Breaker.
Snyder Mine2Jessup 2LackawannaSnyder Coal Co.15,4178,67224,08922928Coal prepared at Underwood Breaker.
Sobleskie Mine2Jessup 2LackawannaSobleskie Coal Co.13,7087,71221,42024524Coal prepared at Underwood Breaker.
Swoyer Mine2Jessup 2LackawannaSwoyer Coal Co.3,6131,7795,39219914Coal prepared at Pompey, Waddell, Ace and Meadowside breakers.
Throop Mining Mine2Throop 1LackawannaThroop Mining Co.1,14010,86212,0022398Coal prepared at Ace Breaker. Includes both deep mined and bank coal.
Turnpike Mine2Jessup 2LackawannaTurnpike Coal Co.32,60717,71050,31723161Coal prepared at Ace, Underwood and Meadowside breakers.
Underwood Breaker2Olyphant 1LackawannaPennsylvania Coal Co.119,3210176,473193489 
Venture Mine2Jessup 2LackawannaVenture Coal Co.5,9372,9248,86124413Coal prepared at Moosic Mountain Breaker.
Village Mine2Jessup 2LackawannaVillage Slope Coal Co.28,6879,56238,24920853Coal prepared at Meadowside Breaker.
Vispi Stripping2Jessup 2LackawannaVispi Coal Co.3,2931,4124,7051575Coal prepared at Pompey and Ace breakers.

Note 1: Added, does not appear in the mine inspection report.

Note 2: From a list of Anthracite Operators. This may not be the operation location.