1951
District 10
Select column header to sort. Hyperlinked items will open a new window.
Operation NameNumberTypeOpeningDistrictCityCountyCompany NameRailroad Shipments (tons)Railroad to MineTruck Shipments (tons)Total Production (tons)Days WorkedEmployeesNotes
Connell Breaker10Mildred 2SullivanBernice White Ash Coal Co.6,00013,01528,76217879 
Delaware Mine10Plains Twp. 1LuzerneHudson Coal Co.150,7250206,990235320Coal prepared at Laflin and Pine Ridge breakers. Includes 27,890 tons stripping coal.
East Boston Mine10Kingston Twp. 1LuzernePringle Coal Co.44,520044,52022877Coal prepared at Waddell and Dial Rock breakers.
Henry Mine10Plains Twp. 1LuzerneLehigh Valley Coal Co.329,12525,277390,056189800Coal prepared at Prospect Breaker.
Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.34,430034,43023170Coal prepared at Laflin Breaker.
Laflin Breaker10Laflin 1LuzerneHudson Coal Co.25,075027,63722160Includes 22,996 tons bank coal.
Madeira Breaker10Plains 1LuzerneConlon Coal Co.56,741062,41322279Breaker discontinued operation on June 25. From then on coal was prepared at Pompey Breaker.
Mineral Spring Mine10Wilkes-Barre 1LuzerneHarry E. Coal Co.43,359098,11728065Coal prepared at Harry E. Breaker.
Miners Mills Breaker10Wilkes-Barre 1LuzerneCapone Coal Co.13,876014,07618478Includes 1,234 tons stripping coal.
Packer Breaker10Wilkes-BarreLuzerneDuryea Anthracite Co.41,1183,15048,694186165 
Pine Ridge Breaker10Wilkes-Barre 1LuzerneHudson Coal Co.171,2910230,252235450Includes 20,750 tons stripping coal.
West Side Mine10Luzerne 2LuzerneWest Side Coal Co.16,346016,34614645Coal prepared at William A. and Dial Rock breakers.

Note 1: Added, does not appear in the mine inspection report.

Note 2: From a list of Anthracite Operators. This may not be the operation location.