1949
District 10
Select column header to sort. Hyperlinked items will open a new window.
Operation NameNumberTypeOpeningDistrictCityCountyCompany NameRailroad Shipments (tons)Railroad to MineTruck Shipments (tons)Total Production (tons)Days WorkedEmployeesNotes
Connell Breaker10Mildred 2SullivanBernice White Ash Coal Co.2,81811,82523,585121104 
Delaware Mine10Plains Twp. 1LuzerneHudson Coal Co.156,5610200,674214370Coal prepared at Laflin and Pine Ridge breakers. Includes 16,246 tons stripping coal.
East Boston Mine10Kingston Twp. 1LuzernePringle Coal Co.38,034038,03421175Coal prepared at Waddell, Harry E, Heidelberg and William A. breakers.
Henry Mine10Plains Twp. 1LuzerneLehigh Valley Coal Co.287,82317,706337,541184657Coal prepared at Prospect Breaker.
Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.28,062028,06220558Coal prepared at Laflin Breaker. Includes 6,302 tons stripping coal.
Laflin Breaker10Laflin 1LuzerneHudson Coal Co.33,212037,26721469Includes 117,879 tons stripping and 6,776 tons bank coal.
Madeira Breaker10Plains 1LuzerneConlon Coal Co.57,005063,421203119Includes 13,024 tons stripping coal.
Mineral Spring Breaker10Wilkes-Barre 1LuzerneFranklin Coal Mining Co.18,026041,75320850Coal prepared at Harry E. Breaker. Includes 18,976 tons stripping coal.
Miners Mills Breaker10Wilkes-Barre 1LuzerneCapone Coal Co.23,670054,270186105Includes 22,649 tons stripping and 2,238 tons bank coal.
Packer Breaker10Wilkes-BarreLuzerneDuryea Anthracite Co.31,5742,24038,708188157 
Pine Ridge Breaker10Wilkes-Barre 1LuzerneHudson Coal Co.185,7230236,377214534Includes 18,296 tons stripping coal.
West Side Mine10Luzerne 2LuzerneWest Side Coal Co.24,639024,63916463Coal prepared at Waddell, William A, Heidelberg, No. 14 and Dial Rock breakers.

Note 1: Added, does not appear in the mine inspection report.

Note 2: From a list of Anthracite Operators. This may not be the operation location.