BackHomeExport

Greenwood Coal Co.
(Greenwood Mining Co.)
Select column header to sort. Hyperlinked items will open a new window.
YearOperation NameNumberTypeOpeningDistrictCityCountyCompany NameRailroad Shipments (tons)Railroad to MineTruck Shipments (tons)Total Production (tons)Days WorkedEmployeesNotes
1889 GreenwoodNo. 2CollieryShaft / Drift 12Lackawanna Twp.LackawannaGreenwood Coal Co., Limited67902,1691288 
1889 Greenwood CollieryShaft / Drift2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited59,285068,230114365 
1890 Greenwood CollieryShaft / Tunnel2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited113,1600123,187139345 
1891 GreenwoodNo. 2CollieryShafts (2) / Tunnel3Lackawanna Twp.LackawannaGreenwood Coal Co., Limited142,6280158,735155358 
1892 GreenwoodNo. 1CollieryShaft / Slope2Lackawanna Twp.LackawannaGreenwood Coal Co.199,6250216,036206461 
1892 GreenwoodNo. 2CollieryTunnel2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited7,126010,1265886 
1893 GreenwoodNo. 1CollieryNo. 1 Shaft / No. 2 Shaft2Lackawanna Twp.LackawannaGreenwood Coal Co.175,0060193,965211501 
1893 GreenwoodNo. 8CollieryNo. 8 Drift / No. 12 Drift2Lackawanna Twp.LackawannaGreenwood Coal Co.55,810060,310217192 
1894 GreenwoodNo. 1CollieryShaft2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited152,6040167,467163495 
1894 GreenwoodNo. 2CollieryShaft2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited52,407056,907145188 
1895 GreenwoodNo. 1CollieryShaft2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited166,9100182,098173499 
1895 GreenwoodNo. 2CollieryShaft2Lackawanna Twp.LackawannaGreenwood Coal Co., Limited63,635068,135167234 
1896 GreenwoodNo. 1CollieryShaft 12Moosic 1LackawannaGreenwood Coal Co., Limited127,5470141,778128513 
1896 GreenwoodNo. 2CollieryShaft 12Moosic 1LackawannaGreenwood Coal Co., Limited56,226060,226128275 
1897 GreenwoodNo. 1CollieryNo. 1 Shaft / New No. 1 Shaft / No. 5 Drift / No. 8 Drift / No. 12 Drift2Moosic 1LackawannaGreenwood Coal Co., Limited129,9420144,108119525 
1897 GreenwoodNo. 2CollieryNo. 2 Shaft / Drift2Moosic 1LackawannaGreenwood Coal Co., Limited64,286068,286103273 
1898 GreenwoodNo. 1CollieryNo. 1 Shaft / New No. 1 Shaft / No. 5 Drift / No. 8 Drift / No. 12 Drift2Moosic 1LackawannaGreenwood Coal Co., Limited125,012NYS&W0138,059113202 
1898 GreenwoodNo. 2CollieryNo. 2 Shaft / Drift2Moosic 1LackawannaGreenwood Coal Co., Limited57,092NYS&W061,59292249 
1899 GreenwoodNo. 1CollieryNo. 1 Shaft / New No. 1 Shaft / No. 5 Drift / No. 8 Drift / No. 12 Drift2Moosic 1LackawannaGreenwood Coal Co., Limited138,971NYS&W0152,259138477 
1899 GreenwoodNo. 2CollieryNo. 2 Shaft / Drift2Moosic 1LackawannaGreenwood Coal Co., Limited56,668NYS&W061,168111244 
1900 GreenwoodNo. 1CollieryNo. 1 Shaft / New No. 1 Shaft / No. 5 Drift / No. 8 Drift / No. 12 Drift / No. 13 Drift2Moosic 1LackawannaGreenwood Coal Co., Limited126,234NYS&W0139,307124464 
1900 GreenwoodNo. 2CollieryNo. 2 Shaft / Drift2Moosic 1LackawannaGreenwood Coal Co., Limited49,403NYS&W053,903100223 
1940 Greenwood Colliery5Moosic 1LackawannaGreenwood Mining Co.115,8520115,852152211 
1940 Greenwood Stripping5Moosic 1LackawannaGreenwood Mining Co.27,376027,37613313 
1941 Greenwood Colliery5Moosic 1LackawannaGreenwood Mining Co.115,6020115,602213183 
1941 Greenwood Stripping5Moosic 1LackawannaGreenwood Mining Co.0Truck 115,23115,23117510 
1942 Greenwood Colliery5Moosic 1LackawannaGreenwood Mining Co.51,698051,698244124 
1942 Greenwood Stripping5Moosic 1LackawannaGreenwood Mining Co.15,629015,6299710 
1943 Greenwood Colliery5Moosic 1LackawannaGreenwood Mining Co.48,942018,94227861 
1943 Laflin MineShaft 110Laflin 1LuzerneGreenwood Mining Co.0Truck 133,30133,30126937 
1944 Greenwood CollierySlope5Moosic 1LackawannaGreenwood Mining Co.45,790045,79031170 
1944 Laflin MineShaft 110Laflin 1LuzerneGreenwood Mining Co.26,937026,93728931Run of mine operation.
1945 Greenwood MineSlope5Moosic 1LackawannaGreenwood Mining Co.43,371043,37128376 
1945 Laflin MineShaft 110Laflin 1LuzerneGreenwood Mining Co.0Truck 122,13722,13723936Run of mine operation.
1946 Greenwood MineSlope5Moosic 1LackawannaGreenwood Mining Co.46,887046,88728779Coal prepared at Marvine Breaker.
1946 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.0Truck 125,20125,20128133Coal preapred at Laflin Breaker. Includes 7,534 tons stripping coal.
1947 Greenwood Mine5Moosic 1LackawannaGreenwood Mining Co.54,190054,19028979Coal prepared at Marvine Breaker.
1947 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.0Truck 116,26516,26523435Coal prepared at Laflin Breaker.
1948 Greenwood Mine5Moosic 1LackawannaGreenwood Mining Co.40,175040,17528766Coal prepared at Marvine Breaker.
1948 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.0Truck 124,86324,86323834Coal prepared at Laflin Breaker. Includes 9,198 tons stripping coal.
1949 Greenwood Mine5Moosic 1LackawannaGreenwood Mining Co.22,172024,11021252Coal prepared at Marvine Breaker.
1949 Greenwood Stripping5Moosic 1LackawannaGreenwood Mining Co.2,78603,398546Coal prepared at Marvine Breaker.
1949 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.28,062028,06220558Coal prepared at Laflin Breaker. Includes 6,302 tons stripping coal.
1950 Greenwood Mine5Moosic 1LackawannaGreenwood Mining Co.22,724030,95224039Coal prepared at Marvine Breaker.
1950 Greenwood Stripping5Moosic 1LackawannaGreenwood Mining Co.4,08906,1462616Coal prepared at Marvine Breaker.
1950 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.30,294030,29423654Coal prepared at Laflin Breaker.
1951 Greenwood Mine6Moosic 1LackawannaGreenwood Mining Co.36,148036,14823538Coal prepared at Marvine Breaker.
1951 Greenwood Stripping6Moosic 1LackawannaGreenwood Mining Co.16,868016,8682728Coal prepared at Marvine Breaker.
1951 Greenwood Bank6Dupont 2LuzerneGreenwood Mining Co.8,55708,5571404Coal prepared at Marvine Breaker.
1951 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.34,430034,43023170Coal prepared at Laflin Breaker.
1952 Greenwood Mine6Moosic 1LackawannaGreenwood Mining Co.28,627028,62721930Coal prepared at Marvine Breaker.
1952 Greenwood Stripping6Moosic 1LackawannaGreenwood Mining Co.33,865033,86521960Coal prepared at Marvine Breaker.
1952 Greenwood Bank6Dupont 2LuzerneGreenwood Mining Co.1,25401,254792Discontinued operation in September. Coal prepared at Marvine Breaker.
1952 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.35,800035,80021770Coal prepared at Laflin and Pine Ridge breakers.
1953 Greenwood MineSlope6Moosic 1LackawannaGreenwood Mining Co.6,55506,55510224 
1953 Greenwood Stripping6Moosic 1LackawannaGreenwood Mining Co.13,180013,18018410 
1953 Greenwood Bank6Dupont 2LuzerneGreenwood Mining Co.8,77208,772693 
1953 Laflin MineDrift / Slope10Laflin 1LuzerneGreenwood Mining Co.0021,11712346 
1953 Laflin Stripping10Laflin 1LuzerneGreenwood Mining Co.003,69900 
1954 Greenwood Stripping6Moosic 1LackawannaGreenwood Mining Co.16,924016,9241028Coal prepared at Marvine Breaker.
1954 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.40,671040,67119467Coal prepared at Hudson Coal Co. (5th District)
1955 Laflin Mine10Laflin 1LuzerneGreenwood Mining Co.15,537019,1289060Coal prepared at Marvine Breaker.
1961 Greenwood StrippingSlope2Moosic 1LackawannaGreenwood Coal Co.3751731,442454Operated during April and May only. Coal prepared at Morgan Breaker.
1962 Greenwood Stripping2Moosic 1LackawannaGreenwood Coal Co.9637247123Company did not operate in1962, coal obtained from storage. Coal prepared at Pompey Breaker.

Note 1: Added, does not appear in the mine inspection report.

Note 2: From a list of Anthracite Operators. This may not be the operation location.

up arrow